Suites 1 & 2
Greenbank House, Hindley Green
Wigan, WN2 4AR
United Kingdom
Tel: +44(0)1942 522180 / 814442,
Fax: +44(0)1942 522179 / 814441
dcvg@dcvg.com
or
sales@dcvg.com

www.dcvg.com

HOME

TRAINING

ECDA

CIPS

DCVG

DC Voltage Gradient Technology & Supply Ltd.

We Lead - Others Follow

SOFTWARE

© DCVG Ltd. 2005

Step 2

ECDA Pre - Assessment Step 1

ECDA

1.1 Objectives
1.2 Identification of ECDA Segments
1.3 Data Collection (Pre-field visit)
1.4 Data Analysis (Pre-field visit)
1.5 Field Visit
1.6 Data Analysis
1.7 Feasibility Analysis
1.8 Indirect Inspection Tool Selection
1.9 Establishment of ECDA Regions
1.10 Indirect Inspection Method
1.11 Approval of Preliminary Pre-Assessment Report

ECDA PROCEDURES MANUAL

ECDA Personnel

ECDA Personnel Roles and Responsibilities
Manager of Systems Integrity
ECDA Project Manager
Indirect Inspection Personnel

ECDA Personnel Qualifications
Manager of Systems Integrity
ECDA Project Manager
ECDA Project Engineer
Indirect Inspection Personnel

Personnel Training in ECDA Concepts.

Note:- Each Section heading has many sub-headings indicating individual steps and actions to be taken.